3、 After the cable line is installed and before it is put into operation, the construction engineering shall complete the decoration work of the construction engineering due to the needs of embedded parts supplement, opening, expanding, etc
Work.
Section
1.0.9
The steel fasteners used for the installation of cables and their accessories, except for the anchor bolts, shall be hot-dip galvanized products.
Section
1.0.10
For cable lines with anti-interference requirements, anti-interference measures shall be taken according to design requirements.
Section
1.0.11
The construction and acceptance of cable lines shall comply with the provisions of the current national standards and specifications in addition to the provisions of this specification.
Chapter II Transportation and Storage
Section
2.0.1
During transportation and loading and unloading,
The cable and cable reel shall not be damaged.
It is forbidden to push down the cable reel directly from the vehicle.
The cable reel shall not be transported horizontally
Store flat.
Section
2.0.2
Before transporting or rolling cable reel,
The cable reel must be firm,
The cable is wound tightly.
The oil pipe between the oil filled cable and the pressure oil tank shall be fixed,
No damage.
The pressure oil tank shall be firm and the pressure indication shall meet the requirements.
When rolling, it must follow the arrow on the cable reel or the winding direction of the cable.
Section
2.0.3
After the cables and their accessories arrive at the site, they should be checked in time according to the following requirements:
1、 Technical documents of products shall be complete.
2、 The cable model, specification and length shall meet the order requirements, and the accessories shall be complete; The cable appearance shall not be damaged.
3、 The cable sealing end shall be tight. When there is doubt in the appearance inspection, damp judgment or test shall be carried out.
4、 The pressure oil tank, oil pipe, valve and pressure gauge of oil filled cable shall meet the requirements and be intact.
3、 After the cable line is installed and before it is put into operation, the construction engineering shall complete the decoration work of the construction engineering due to the needs of embedded parts supplement, opening, expanding, etc
Work.
Section
1.0.9
The steel fasteners used for the installation of cables and their accessories, except for the anchor bolts, shall be hot-dip galvanized products.
Section
1.0.10
For cable lines with anti-interference requirements, anti-interference measures shall be taken according to design requirements.
Section
1.0.11
The construction and acceptance of cable lines shall comply with the provisions of the current national standards and specifications in addition to the provisions of this specification.
Chapter II Transportation and Storage
Section
2.0.1
During transportation and loading and unloading,
The cable and cable reel shall not be damaged.
It is forbidden to push down the cable reel directly from the vehicle.
The cable reel shall not be transported horizontally
Store flat.
Section
2.0.2
Before transporting or rolling cable reel,
The cable reel must be firm,
The cable is wound tightly.
The oil pipe between the oil filled cable and the pressure oil tank shall be fixed,
No damage.
The pressure oil tank shall be firm and the pressure indication shall meet the requirements.
When rolling, it must follow the arrow on the cable reel or the winding direction of the cable.
Section
2.0.3
After the cables and their accessories arrive at the site, they should be checked in time according to the following requirements:
1、 Technical documents of products shall be complete.
2、 The cable model, specification and length shall meet the order requirements, and the accessories shall be complete; The cable appearance shall not be damaged.
3、 The cable sealing end shall be tight. When there is doubt in the appearance inspection, damp judgment or test shall be carried out.
4、 The pressure oil tank, oil pipe, valve and pressure gauge of oil filled cable shall meet the requirements and be intact.
3、 After the cable line is installed and before it is put into operation, the construction engineering shall complete the decoration work of the construction engineering due to the needs of embedded parts supplement, opening, expanding, etc
Work.
Section
1.0.9
The steel fasteners used for the installation of cables and their accessories, except for the anchor bolts, shall be hot-dip galvanized products.
Section
1.0.10
For cable lines with anti-interference requirements, anti-interference measures shall be taken according to design requirements.
Section
1.0.11
The construction and acceptance of cable lines shall comply with the provisions of the current national standards and specifications in addition to the provisions of this specification.
Chapter II Transportation and Storage
Section
2.0.1
During transportation and loading and unloading,
The cable and cable reel shall not be damaged.
It is forbidden to push down the cable reel directly from the vehicle.
The cable reel shall not be transported horizontally
Store flat.
Section
2.0.2
Before transporting or rolling cable reel,
The cable reel must be firm,
The cable is wound tightly.
The oil pipe between the oil filled cable and the pressure oil tank shall be fixed,
No damage.
The pressure oil tank shall be firm and the pressure indication shall meet the requirements.
When rolling, it must follow the arrow on the cable reel or the winding direction of the cable.
Section
2.0.3
After the cables and their accessories arrive at the site, they should be checked in time according to the following requirements:
1、 Technical documents of products shall be complete.
2、 The cable model, specification and length shall meet the order requirements, and the accessories shall be complete; The cable appearance shall not be damaged.
3、 The cable sealing end shall be tight. When there is doubt in the appearance inspection, damp judgment or test shall be carried out.
4、 The pressure oil tank, oil pipe, valve and pressure gauge of oil filled cable shall meet the requirements and be intact.
New energy cable After the line is installed and before it is put into operation, the construction engineering shall complete the decoration work of the construction engineering due to the needs of the embedded parts supplement, opening, expanding, etc.
Article 1.0.9 Steel fasteners used for installation of cables and accessories shall be hot-dip galvanized products except for anchor bolts.
Article 1.0.10 For cable lines with anti-interference requirements, anti-interference measures shall be taken according to design requirements.
Article 1.0.11 The construction and acceptance of cable lines shall comply with the current national standards and specifications in addition to the provisions of this specification. Chapter II Transportation and Storage
Article 2.0.1 During transportation, the cable and cable reel shall not be damaged. It is forbidden to push down the cable reel directly from the vehicle. The cable reel shall not be transported and stored horizontally.
Article 2.0.2 Before transporting or rolling the cable reel, ensure that the cable reel is firm and the cable is tightly wound. The oil pipe between the oil filled cable and the pressure oil tank shall be fixed without damage. The pressure oil tank shall be firm and the pressure indication shall meet the requirements.
When rolling, it must follow the arrow on the cable reel or the winding direction of the cable. Article 2.0.3 After the cables and their accessories arrive at the site, they shall be checked in time according to the following requirements:
1、 Technical documents of products shall be complete.
2、 The cable model, specification and length shall meet the order requirements, and the accessories shall be complete; The cable appearance shall not be damaged.
3、 The cable sealing end shall be tight. When there is doubt in the appearance inspection, damp judgment or test shall be carried out.
4、 The pressure oil tank, oil pipe, valve and pressure gauge of oil filled cable shall meet the requirements and be intact.