contact us
Contact

Company name: Shandong Peninsula Cable Co., Ltd

Tel.: 0535-8621134

Mobile: 13688691898

Email: [email protected]

Q Q :1653178622

website: sxhengnuo.cn

Address: Tonghai Road, High tech Development Zone, Longkou, Shandong

Your current location: home page >> News bulletin
  • New energy cable manufacturers share experience and knowledge in cable industry

    When the new energy cable manufacturer shares with you the connection between the two ends of the cable and other electrical equipment, it needs a connection device that can meet certain insulation and sealing requirements. This device is called cable terminal. The cable terminal head can be divided into indoor head and outdoor head according to the different use occasions. The device that connects several cables to form a longer cable line is called the middle head. Connect the above power
    Published on: July 27, 2016 Clicks: 193

  • Precautions for locomotive cable operation

    Precautions for locomotive cable line operation (1) Do not overload or overheat for a long time. Therefore, the monitoring of cable load current, external temperature and joint temperature should not be ignored; (2) The cable line feeder protection shall not be put into reclosing. Most of the cable line faults are permanent faults. If the reclosing action is taken, the accident will inevitably expand and threaten the power grid
    Published on: July 27, 2016 Number of hits: 185

  • Operation and maintenance of power cable

    Operation and maintenance of power cables The operation of power cable lines is one of the important links in power production. The safety of cable line operation is related to the safety of enterprise production and the safety of people's lives and property. Based on years of work experience, the author briefly introduces the relevant issues in the operation and maintenance of power cables. Characteristic electricity of cable line
    Published on: July 27, 2016 Number of hits: 150

  • Basic methods for installation and commissioning of ordinary cables

    Power cable installation, commissioning scheme and implementation method 1) Cable laying requirements 1. The cable steel support must be correctly positioned, firmly welded, neatly arranged, and provided with anti-corrosion treatment; 2. The cable steel support shall be reliably grounded, and the grounding wire shall be connected by lap welding, and the welding length must meet the specification requirements;
    Published on: July 27, 2016 Number of hits: 351

  • Power cable installation equipment

    Function, structure and characteristics of power cable connection equipment power cable branch box: (1) Function: to complete the convergence and tapping of cable lines in the distribution system, but generally it is not equipped with switches, and it is not equipped with special electrical connection equipment with secondary auxiliary configuration such as control measurement. (2) Structure: there is no switchgear in the branch box
    Published on: July 27, 2016 Clicks: 194

  • Role of power loop network unit

    Function, structure and characteristics of power cable ring network unit: (1) Function: power cable ring network unit, also known as ring network cabinet or switch, is used for MV power cable segmentation. Contact and tap load. The power cable ring network unit can be divided into indoor and outdoor types according to the applicable places, and can be divided into integral type and interval type according to the structure.
    Published on: July 27, 2016 Number of hits: 219

  • Route design -- optimize cable route scheme

    For power cable lines with anti-interference requirements, anti-interference measures shall be taken according to power cable design or equipment manufacturer requirements. For lighting poles equipped with lightning rods, the cable laying shall meet the relevant requirements of grounding devices. The cable entering the building shall be equipped with a protective barrier. When entering the panel (cabinet) and penetrating the pipe, the inlet and outlet shall be closed, and the pipe orifice shall be sealed& n
    Published on: July 27, 2016 Clicks: 147

  • Line test, acceptance and operation

    Test and acceptance of power cable put into operation (I) Test of power cable In addition to handover test and preventive test, insulation test shall also be carried out during construction to identify and check the cable quality and process quality of each link of construction. Before laying, test on the cable reel to identify the cable cup; Test after and before laying
    Published on: July 27, 2016 Clicks: 142

  • What are the necessary works for cable network operation

    Before running the cable network, the security work must be done well. 1. Load monitoring. General power cable lines specify the maximum current value according to the cross-sectional area of the cable conductor, insulation type, etc. Various instruments are used to measure the load current of the wire line or the cable skin temperature, etc., as the main load monitoring measures, to prevent the cable insulation from exceeding the allowable maximum temperature and shortening the cable
    Published on: July 27, 2016 Clicks: 149

273 in total 12 entries per page Page: 23/23
home page previous page fourteen fifteen sixteen seventeen eighteen nineteen twenty twenty-one twenty-two twenty-three Last page

contact us

Shandong Peninsula Cable Co., Ltd

Tel.: 0535-8621134

Q        Q:1653178622

Email: [email protected]

Address: Tonghai Road, High tech Development Zone, Longkou, Shandong

 New energy cable 1522035370290487.png